When choosing a glass and aluminum manufacturer, confirm which storefront, curtain wall, window, and entrance systems the company can supply for your project.

How to Choose a Glass and Aluminum Manufacturer for Commercial Projects

Home / 2026 / November

Two suppliers can quote the same storefront system and leave different work to the installer. Before you request a quote, identify which companies can supply the systems your commercial project needs. Ask what each company fabricates in-house, what it sources from other suppliers, and what work your team will need to handle.

A storefront quote may cover stock-length aluminum profiles, precut components, or an assembled system. Confirm whether glass and hardware are included and what work falls to the installer.

Who Actually Fabricates the System?

A manufacturer performs some or all of the fabrication work for the system it offers. A distributor sells products from one or more manufacturers and may coordinate the order with them. In either case, ask who makes the main components and who will answer technical questions.

What to verify

What to ask

What to request

Who makes the components

Which components do you fabricate in-house, and which do you buy from other suppliers or have fabricated elsewhere?

Written confirmation of who fabricates the frame, door, and other main components.

What you will receive

Will you deliver uncut aluminum profiles, cut components, or an assembled system? Are glass and hardware included?

A written quote listing what will be delivered and what work falls to your team or installer.

Who checks compatibility

Who confirms that the frame, glass, door, and hardware are compatible?

The name and contact details of the person responsible for confirming compatibility.

At PRL, we fabricate storefront framing and entrance doors in-house. We also supply aluminum profiles in stock lengths for shop fabrication. If you request stock lengths, confirm who will cut the profiles and fabricate the frame. If you request a complete system, check which glass, hardware, and fabrication work the quote includes.

Which Systems Can the Manufacturer Supply for Your Project?

Use the questions that apply to the systems shown in your drawings.

System

What to ask

Storefront

Which framing series do you propose? Can you include a compatible entrance in the same quote?

Curtain wall

Which curtain wall series do you propose for the façade? What documentation is available for that configuration?

Commercial entrances

Can you fabricate the door and frame to the project dimensions? Can you supply the hardware specified in the drawings?

Windows

Which fixed and operable configurations do you offer? What glass types and thicknesses does each configuration accommodate?

Architectural glass

Can you supply glass in the make-up and dimensions shown in the drawings?

If an entrance requires a custom-sized door, send the width and height of the opening where the frame will be installed. Specify whether the door should swing inward or outward, and share the finish code if you have it. Ask whether the manufacturer can quote the door and frame and which dimensions need to be verified on site before fabrication.

Shop drawings show how the quoted glass and aluminum system is configured for the project. Confirm who will review the drawings and verify opening dimensions on site before fabrication.

What Documents and Technical Support Can You Request?

When comparing quotes, check which documents describe the product series and which will be prepared for your project. Ask what information the manufacturer still needs before fabrication can begin.

  • Technical data sheet. Check that it covers the series listed in the quote. If the sheet shows several configurations, ask the manufacturer to identify the one it has quoted for your project.
  • Shop drawings. If included in the quote, shop drawings show the proposed system for your project, including its dimensions and the location of key components. Confirm who will prepare and review the drawings, who will verify dimensions on site, and when those measurements are needed.
  • Installation manual. Ask for the manual for the quoted series and a technical contact the installer can reach with questions about the proposed configuration. For example, PRL publishes the technical data sheet and installation manual for its 250 DT storefront series.

Production lead time and delivery date. Ask what must be confirmed before fabrication can begin, how long production is expected to take, and when the order is expected to reach the jobsite. Compare that delivery date with your installation schedule.

Checklist for Shortlisting Manufacturers

  • Which components does the company fabricate in-house, and which does it source or have fabricated elsewhere?
  • Which systems shown in my drawings can the company quote?
  • What does the quote include, and what work will my team or installer need to handle?
  • What technical data sheets, shop drawings, or samples can the company provide, and when?
  • Who verifies dimensions on site, and who answers technical questions?
  • What needs to be confirmed before fabrication can begin? What are the estimated production lead time and jobsite delivery date?

Share your drawings or opening schedule with PRL, along with the systems you need and your target jobsite delivery date. We’ll confirm what we can fabricate and supply and let you know what else we need to prepare a quote.

 

When a frameless shower door keeps its original hinges and handle, the replacement pane’s holes and cutouts must match the hardware. These details are set before tempering.

What Is Tempered Glass? Strength, Safety, Uses & Limitations

Home / 2026 / November

Tempered glass, also called toughened glass, is made by heating a pane and cooling it rapidly to increase its resistance to breakage. When fully tempered glass breaks, it typically shatters into small fragments, which helps reduce the risk of serious cuts.

A corner stamp can identify a pane as tempered glass. It may also name the fabricator and list the safety glazing standard the pane is marked to meet.

How to Tell if Glass Is Tempered

Look for a small stamp near a corner of the pane. The mark may be etched or printed on the glass. Check each pane separately in a shower enclosure or glass entrance, since panes in the same assembly can have different specifications.

What to Look for on the Glass Stamp

Look for “Tempered” or a code that identifies the glass type. The stamp may also name the fabricator and list a safety glazing standard, such as ANSI Z97.1 or CPSC 16 CFR Part 1201. If it includes an SGCC number, look up the product in the SGCC Certified Products Directory.

What to Do if You Can’t Find a Stamp

Ask the installer or fabricator for a record that identifies the specific pane. A glazing schedule, product submittal, or order record can tell you what was supplied. Dark bands or spots seen through polarized lenses can indicate heat treatment. They can appear in both fully tempered and heat-strengthened glass, as the NGA explains in its technical paper on iridescence.

How Is Tempered Glass Made?

Fabricators start with an annealed glass pane that has already been cut and prepared for the job. The furnace heats the pane evenly to near its softening point. As the glass leaves the furnace, air jets cool both faces quickly and evenly. This step is called quenching.

The surfaces cool and stiffen while the center is still hot. As the center cools and contracts, it puts the surfaces in compression and leaves the interior in tension. The surface compression makes it harder for a crack to spread, giving the pane greater resistance to breakage. The National Glass Association describes this process in its production guidelines for heat-treated flat glass.

How Strong Is Tempered Glass?

Fully tempered glass has about four times the breakage strength of annealed glass of the same thickness under comparable conditions. The National Glass Association gives this figure as a rule of thumb for heat-treated glass.

Tempering leaves the glass’s stiffness unchanged. Take two panes of the same size and thickness, one annealed and one fully tempered. With the same supports and the same evenly distributed load, both panes bend by the same amount. This distinction matters when the design sets a limit on deflection, as described in the GANA Glazing Manual.

Does Tempered Glass Shatter?

Yes. When a single pane of fully tempered glass shatters, the fragments can fall from the opening. A hard impact can break the pane, and a chipped edge can lead to breakage later. A nickel sulfide inclusion is a less common cause of spontaneous breakage.

An interlayer helps hold fragments together after breakage in a laminated assembly, which can also incorporate tempered panes. That behavior is one factor in choosing laminated or monolithic tempered glass for an opening.

Rapid air cooling after heating puts the surfaces of tempered glass in compression, making it harder for cracks to spread.

What Is Tempered Glass Used For?

In buildings, tempered glass is used where the design calls for greater breakage resistance or safety glazing. Certain doors and shower enclosures are covered by the U.S. safety standard for architectural glazing. The locally adopted building code can also set requirements for a particular location or assembly.

Application

What to Check

Shower doors and enclosures

Check the safety glazing mark on each panel, including fixed panels.

Glass entrance doors and sidelites

Check the requirements for the door and each adjacent panel. Confirm which glass the framing and hardware can accept.

Windows and interior partitions

Check whether the pane’s size, height above the floor, or distance from a door affects the glazing requirements.

Glass guards and overhead glazing

Check the required glass composition and any provisions for retaining or catching fragments after breakage.

Can Tempered Glass Be Cut or Drilled?

A finished tempered pane can’t be cut or drilled to fit. Cutting, drilling, notching, and edge finishing must be completed before tempering. If the finished size or hole pattern changes, the fabricator needs to make a new pane. This sequence is part of the fabrication requirements in ASTM C1048.

When replacing the glass in a frameless shower door and keeping the existing hinges and handle, the new pane has to match both the opening and the hardware. A pane with the right width and height may still fail to fit if a hinge cutout is out of position. Use a hardware template or dimensioned drawing to specify the hole and cutout locations.

For a custom tempered glass panel, send the application, finished dimensions, and any hardware drawings to PRL Glass & Aluminum. Include the glass thickness and edge finish if you know them.

In a long aluminum storefront, coordinate frame joints and supports with the layout of glass panels and entrances. At each entrance, allow for the expected movement while preserving the door’s operating clearances.

Glass and Aluminum Systems for Regions with Extreme Temperature Swings

Home / 2026 / November

An aluminum storefront frame expands in the afternoon sun and contracts as it cools overnight. A recessed window on the same building may stay shaded and experience a smaller temperature swing. Each opening needs movement allowances that reflect its exposure.

When specifying windows, storefront, or curtain wall for a site with large temperature swings, start with the temperatures the glass and framing will experience. Those conditions help determine the clearances around the glass, the location of frame joints, and the connections to the building.

Insulating glass units and thermally broken aluminum frames help limit heat transfer through windows. Glass clearances and movement joints accommodate changes in dimension as the assembly heats and cools.

How Temperature Swings Affect Glass and Aluminum

Weather data gives the design team a starting point. Component temperatures also depend on direct sun, shade, and how much solar energy the materials absorb. When establishing the design range, consider how exposure changes from day to night and across seasons.

Glass and aluminum expand and contract at different rates. The length of the framing matters too: if two profiles of the same material are free to move and undergo the same temperature change, the longer one changes length more. Account for this movement where profiles meet and where the frame surrounds the glass.

Whether the project is a sun-exposed storefront in Arizona or Nevada, or a glazed façade in New Mexico, Colorado, or Utah, base the range on the actual site and each façade’s exposure.

Where a Glazing Assembly Needs Room to Move

The drawings should show where the glass is supported, which frame joints allow movement, and how the assembly meets the wall. These details help the system retain the glass and maintain its seals as temperatures change.

Coordinate Glass Clearance, Bite, and Support

Inside the glazing pocket, edge clearance gives the glass room to move without contacting the metal frame. Glass bite is the depth of the glass edge engaged by the framing. There must be enough bite to retain the panel throughout the expected movement. Setting blocks support the weight of the glass and help position it in the pocket.

Set the clearance and bite together. With the same pocket depth, increasing the clearance at an edge reduces the bite at that edge. Follow the system’s requirements for glass retention and blocking for the specified glass makeup. The National Glass Association’s glazing manual provides guidance on these relationships.

Detail Frame Joints and Perimeter Seals

Review the splices between aluminum sections and the perimeter joints where the frame meets the wall. At locations designed to move, check how far each joint can open or close over the expected temperature range. The gap at installation must leave room for that movement.

For a sealant joint designed to move, match the joint dimensions to the expected movement and the sealant’s rated capacity. Coordinate nearby trim and attachments with the joint detail so they leave the intended movement path clear. NIST’s building envelope guidance explains why seals at these interfaces must accommodate movement between materials.

What IGUs and Thermal Breaks Contribute

Once the assembly has room for expansion and contraction, review how it limits heat transfer. The glass and frame contribute to that performance and should be evaluated together.

Select Insulating Glass for the Opening

Insulating glass units reduce heat transfer by separating panes with a sealed space. The glass makeup, cavity, and spacer affect the unit’s performance. When comparing thermal data for a window or façade, use values that account for the specified framing as well as the glass.

As the temperature inside an IGU changes, the pressure difference across its panes can change and cause them to bow. The response depends on the unit’s dimensions and construction. Share the proposed glass makeup, panel size, and anticipated exposure with the fabricator so the IGU can be reviewed alongside its support and clearances.

Specify a Thermal Break for the Frame

A thermal break uses a less conductive material between the interior and exterior portions of an aluminum frame. It reduces heat flow through the frame. Movement joints and clearances still need to be detailed separately, because they accommodate changes in dimension as the assembly heats and cools.

Aluminum frames expand as they warm and contract as they cool. Glazing pockets need enough edge clearance to accommodate movement while keeping the glass securely engaged in the frame.

What to Check in Windows, Storefront, and Curtain Wall

For operable windows, start with sash alignment and seal contact. For storefront and curtain wall, review where the framing meets entrances, adjacent wall materials, and the building structure.

Max Windows: Alignment and Operation

PRL Max Windows are available in fixed, awning, and casement configurations with thermally broken aluminum framing. For an awning or casement unit, review the frame alignment and the clearances needed for the sash to close and engage its weather seals.

Specify the operating type, dimensions, and glass makeup together. PRL reports that performance results vary with those details, so use the thermal and weather performance data for the proposed window.

Storefront: Framing Runs and Entrances

PRL offers a thermally broken configuration of its 251DT storefront series. For a long storefront run, lay out the frame joints alongside the glass panels, supports, and entrance locations. If an entrance shifts during design, check how the new layout affects adjacent frame joints and supports.

At an entrance, review the connection between the door frame and the adjacent fixed glazing. That detail has to account for the movement specified for the storefront while preserving the door’s operating clearances and seal contact.

Curtain Wall: Supports and Connections

With PRL curtain wall systems, coordinate panel dimensions and mullion lengths with the supports, splices, and connections to the building. Identify which connections carry the required loads and where the design allows the framing to move.

When the specification calls for thermal cycling tests, AAMA 501.5-23 provides a laboratory method for evaluating permanent damage in large exterior fenestration and cladding components. If a mockup is required, confirm which glazing, joints, and attachments it needs to represent.

What to Share Before Requesting a Quote

Mark areas of direct sun and long framing runs on the drawings. Send them with the opening schedule and the following information:

  • Project location, façade orientation, and shading.
  • Opening dimensions, lengths of framing runs, and system type.
  • Proposed glass makeup and required thermal performance.
  • Expected component temperatures and movement criteria, if available.
  • Supporting construction and proposed joint or attachment details.

Send your drawings and project requirements to PRL Glass & Aluminum to discuss insulating glass, Max Windows, storefront, or curtain wall options for your project.

Inspect a newly installed aluminum entry door from both sides. Before handover, check that it swings freely, closes normally and matches the approved glass, hardware and finish selections.

What to Check After Installing an Aluminum Entry Door

Home / 2026 / November

An entry door can look aligned when closed and still scrape the threshold as it opens. During the final walkthrough, operate the door with the installer present so you can point out exactly where it catches, rubs or fails to latch.

Use this exterior door installation checklist before handing over a completed installation. For a Sunny Lux aluminum entry door, keep the approved project drawings and PRL’s installation instructions on hand.

During the final entry door inspection, close the door at a normal pace and check that the latch engages without an extra push. Verify that the lock and handle operate as intended.

Check the Swing, Alignment and Lock

Open and close the door several times at a normal pace. The moving panel, or leaf, should clear the frame and threshold without rubbing or binding. Confirm that the swing matches the approved drawings and that the leaf clears nearby walls, flooring and fixtures. The areas to check will vary between inswing and outswing entry doors.

During the entry door installation inspection, check:

  • Leaf alignment. Have the installer verify the leaf’s vertical and horizontal position within the frame. If it rubs, note where contact occurs and at what point in the swing.
  • Latch, lock and handle. Check that the latch engages when the door closes normally. Verify that the hardware locks and unlocks as intended and that the handle returns to its resting position after use.
  • Paired doors. Ask the installer to demonstrate how each leaf operates and, where applicable, how the secondary leaf is released and secured.

Record what you observe. “The lower latch-side corner rubs just before the door closes” tells the installer where to look. Leave hardware and alignment adjustments to the installer, who can check the cause against the installation instructions.

Inspect the Frame, Glass, Weather Seals and Finish

Walk around the door and inspect it from both sides. Use the approved entry door specifications to verify the installed glass, hardware and finish.

Frame and jambs. Have the installer verify that the frame is plumb, level and securely fastened. Confirm that the adjustable jambs are secured in their final positions and that the hinge screws and other fasteners have been checked. Refer to installation records for fixings that are already concealed.

Glass and glazing. Check that the glass is centered and that visible glazing stops or retainers are fully seated. Look for chips, cracks, scratches, gaps in the glazing sealant and unintended contact between the glass and frame. Have the installer confirm the placement of setting blocks and shims where they are no longer visible.

Exterior door weather seals. Check that the weatherstripping is seated and makes continuous contact along the intended sealing perimeter when the door is closed. Pay particular attention to corners and transitions at the threshold. Check any frame-to-opening sealant against the approved detail, looking for gaps or areas where it has pulled away. If the project requires air or water testing, review the test results separately from the visual inspection.

Finish and cleanup. Inspect the glass and exposed aluminum for scratches, dents or adhesive residue. Confirm that the threshold and swing path are clear of debris and that tools and leftover materials have been removed.

Check that the exterior door weather seals are seated and make continuous contact where the closed door is designed to seal. Pay particular attention to the corners and the transition at the threshold.

Record the Final Inspection and Hand Over the Door

Mark each item on the Sunny Lux checklist after it has been verified. If something needs attention, record the door location, the condition observed and who will address it. Recheck the affected functions after each correction. After a jamb adjustment, for example, operate the door again and verify latch engagement and seal contact.

Before handover, have the installer demonstrate how to open, close and lock the door. Give the owner or building team the completed inspection checklist, the installer’s contact information and the Sunny Lux end-user manual.

The final inspection gives the owner a record of the door’s condition at handover. Once the door is in use, follow the manual for cleaning and periodic checks. PRL’s residential aluminum door maintenance guide covers routine care and signs of wear to watch for over time.

Download the Sunny Lux final inspection checklist and review the completed installation with your installer before handover.

Technical profile diagrams showing Block Frame and Nail Fin configurations for PRL MAX Windows.

PRL MAX Windows Catalog: Aluminum Window Models and Technical Specifications

Home / 2026 / November

The PRL MAX Windows catalog brings together product photos, specification sheets for Casement, Awning, and Fixed windows, frame profile diagrams, and technical specifications in one downloadable PDF. Architects and contractors can review window dimensions, opening mechanisms, and glass options before preparing a project inquiry.

TECHNICAL BROCHURE
VIEW TECHINICAL BROCHURE
TECHNICAL BROCHURE
VIEW TECHNICAL BROCHURE
TECHNICAL BROCHURE
VIEW TECHNICAL BROCHURE

MAX Window Models Included in the Catalog

The catalog features three aluminum window models with different operating configurations: MAX Casement is side-hinged and opens outward; MAX Awning has top hinges and opens outward from the bottom; and MAX Fixed is a non-operable window.

For Casement and Awning, the specification sheets include two opening mechanisms:

  • Crank Out: The window opens using a crank handle.
  • Push Out: The window opens by pushing the sash directly outward.

Pages 6–8 contain individual specification sheets with information on:

  • Maximum dimensions and weight limits for each model.
  • Available opening mechanisms, where applicable.
  • Glass options and configurations.

The distinction between side-hinged and top-hinged operation is also important when considering the differences between aluminum casement and awning windows, particularly in terms of ventilation, operation, and applications.

Frame Configurations, Glass Options, and Technical Details

Pages 4–5 include frame profile diagrams for two installation configurations:

  • Block Frame: Designed for masonry openings, including concrete or concrete block walls, where an exterior mounting flange is not required.
  • Nail Fin: Features a mounting flange for attachment to wood or metal framing in new construction or full-frame replacement projects.

The catalog also presents two glazing options:

  • 1-inch Insulating Glass Unit (IGU): Two glass panes separated by a sealed spacer.
  • Impact-Resistant Glazing: An optional alternative, subject to project requirements and system compatibility.

Additional information on aluminum profiles, finishes, and hardware is included in the technical brochure. These components are part of the broader PRL MAX Windows system, which offers multiple window configurations for residential and commercial projects.

Page 9 provides performance data and references to testing for air infiltration, water penetration, structural performance, durability, and thermal transmittance. Results and applicable specifications should be confirmed for the selected window configuration.


PRL MAX Casement, Awning and Fixed aluminum window models featured in the technical catalog.

Review the MAX Windows Catalog for Your Project

When contacting PRL, have the following information ready:

  • Window model of interest.
  • Dimensions of the wall opening where the window will be installed.
  • Crank Out or Push Out operation, where applicable.
  • Block Frame or Nail Fin configuration.
  • Glass requirements and specific project conditions.

Share these details with PRL Glass & Aluminum to review compatible configurations and available options. Our team can help confirm the specifications for your project and provide a quote.


Site elevation and opening height above the ground are different design inputs. Wind pressures, glass dimensions, framing spans, and structural connections must be considered together when selecting windows and curtain wall.

Glass and Aluminum Systems for Buildings at High Elevations

Home / 2026 / November

A high-elevation building may need solar control during the day, insulation through cold weather, and glazing that withstands the site’s wind loads. Insulating glass units also need attention to the difference between the elevation where they are fabricated and where they will be installed.

For projects in Colorado, Utah, New Mexico, Nevada, and Idaho, provide the site elevation before the glazing is fabricated. The local climate, opening dimensions, and façade orientation also help establish what the glass and aluminum systems must accommodate.

Elevation changes between fabrication, shipping, and installation can create pressure differences across an IGU’s panes. Unit dimensions, glass construction, and anticipated conditions help determine whether pressure compensation is needed.

Assess Solar Exposure and Temperature Conditions

A west-facing room with extensive glazing may need solar control even where winters are cold. A shaded opening on the same building may have different daylight and heat-gain requirements. Start with orientation, shading, glazing area, and how the space will be used.

Select Low-E Glass for the Building’s Solar Needs

Low-E glass uses coatings to reduce radiative heat transfer and can be selected for different levels of solar gain. Compare three performance measures when developing the specification:

  • U-factor: the rate of heat transfer through the product; a lower value indicates better insulation.
  • Solar heat gain coefficient (SHGC): the fraction of solar energy admitted through the product; a lower value means less solar heat gain.
  • Visible transmittance (VT): the fraction of visible light transmitted; a higher value admits more daylight.

The NFRC explanation of window ratings describes how these values relate to climate and orientation. Compare results on the same basis: glass-only data and whole-window ratings describe different assemblies.

The appropriate SHGC depends on the building’s energy design. Some winter solar gain may be useful in a heating-dominated building, while a highly glazed room may need stronger control of afternoon heat. Altitude alone does not determine that balance.

Account for Temperature Differences Across the Glass

A glass panel can be warm in the sun while its edges remain cooler within the frame. Partial shading, interior blinds, and nearby heating outlets can also affect the temperature distribution across the pane.

These differences can create thermal stress. Glass composition, coating location, edge quality, and framing influence how the panel responds. Thermal-stress evaluation must consider temperature differences across the pane, along with the glass construction and its support.

Identify overhangs and shading patterns early enough for them to be included in the glass selection. The appropriate heat treatment should follow the project’s thermal-stress evaluation and safety requirements.

Plan Insulating Glass Units for Elevation Differences

Insulating glass units contain a sealed cavity between glass panes. A difference between cavity pressure and surrounding atmospheric pressure can make the panes bow. Changes in cavity temperature also affect this response.

This is a separate design consideration from wind pressure acting across the façade. The IGU fabricator needs the expected elevation and temperature conditions, while the structural design must also address the project’s wind loads.

Consider Manufacturing, Shipping, and Installation Elevations

When a sealed IGU moves from a lower manufacturing elevation to a higher installation site, the surrounding atmospheric pressure decreases. The cavity pressure may then push the panes outward, placing stress on the glass and edge seal. The amount of deflection depends on the unit’s dimensions and construction.

The route to the site matters too. A shipment may cross a mountain pass above the destination, exposing the units to a larger elevation difference during transport than they will experience after installation.

Share the installation elevation and known shipping constraints before production. This gives the fabricator an opportunity to assess the proposed glass thicknesses, cavity width, and panel sizes against the anticipated conditions.

Confirm Whether Pressure Compensation Is Needed

The fabricator should determine whether the proposed units need pressure compensation. The decision depends on panel dimensions, glass thickness, cavity width, and the anticipated elevation and temperature conditions.

Capillary tubes are one method used in the industry to permit pressure equalization. Their use requires attention to moisture exposure, coating compatibility, gas fill, and sealing procedures. The manufacturer should define the method and any associated installation instructions for the selected unit.

The thermal data must represent the final construction. An air-filled unit, for example, should not be assigned values calculated for an argon-filled unit. Resolve any required pressure-compensation and sealing procedures before the glass arrives onsite.

Determine Wind Requirements for the Actual Site

Elevation above sea level and opening height above the ground are different design inputs. A low-rise building on elevated terrain still needs a wind evaluation based on its location, geometry, and surroundings. Upper-floor openings add height-related considerations.

Ridges, slopes, and surrounding obstructions can affect wind conditions. The project’s design professional should establish the applicable positive and negative pressures rather than deriving a rating from altitude alone. Glass dimensions, framing spans, deflection limits, and structural connections can then be selected around those requirements.

For example, two openings at the same site elevation may need different framing because one has a larger unsupported span. Similar appearance or glass thickness does not establish equivalent structural performance.

Water resistance requires its own performance information. The relationship between structural loads, drainage, and water testing is discussed in PRL’s article on glass and aluminum systems for high-wind regions.


Low-E selection should balance insulation, solar heat gain, and daylight. The appropriate U-factor, SHGC, and visible transmittance depend on the building’s climate, orientation, shading, and intended use.

Match Glass and Framing to the Opening

Fixed glazing, operable windows, and larger façades introduce different support and operating details. Glass thickness, unit weight, and overall glazing depth must fit the selected system. Establish these details alongside the thermal and structural requirements.

Laminated Glass for Safety and Retention Requirements

Laminated glass bonds glass layers with an interlayer that can retain fragments after breakage. It can be specified for applications with particular safety or retention requirements and may form part of a compatible IGU.

The laminate’s thickness and weight affect the complete glass makeup and its support. Its use does not establish wind capacity or resolve an IGU’s elevation-related pressure conditions. Those depend on the specified construction and the opening’s design.

Max Windows for Fixed and Operable Openings

PRL Max Windows are available in fixed, awning, and casement configurations, with thermally broken aluminum profiles designed to accommodate 1-inch IGUs. Select the operating type according to the room’s ventilation needs and intended use.

PRL notes that performance results vary with window type, dimensions, and glass configuration. Review thermal, structural, air-leakage, and water-penetration information for the proposed unit. A result for one operating type should not be assumed to cover another.

The window schedule should identify the glass makeup and operating type together. This gives the project team a clear reference when reviewing drawings, quotations, and fabrication details.

Curtain Wall for Larger Glazed Areas

PRL curtain wall systems provide framing options for larger glazed areas. Mullion spacing and depth, structural supports, and connection details need to be developed alongside the glass layout.

For a glazed lobby, establish the panel divisions and solar-control goals together. A change in glass composition can affect weight and overall unit thickness, with consequences for glazing pockets, support details, and installation.

Movement allowances and perimeter connections also need to be detailed for the proposed façade. The selected glass and framing must function as an assembly under the project’s specified conditions.

Share Project Conditions Before Requesting a Quote

Include the opening schedule and site conditions when requesting a quote. This helps PRL discuss available glass and framing options using the dimensions and performance requirements for the actual project.

For a new project or replacement, provide:

  • Project address and installation elevation.
  • Opening dimensions and position on the building.
  • Orientation, shading, and use of the interior space.
  • Required U-factor, SHGC, and daylight objectives.
  • Positive and negative design pressures.
  • Proposed glass makeup, system type, and operation.
  • Known shipping constraints or elevation changes.
  • Supporting construction and available installation details.

For replacement work, include the existing frame and glass construction. Retained framing must be assessed for its condition and compatibility with the proposed replacement unit.

Contact PRL Glass & Aluminum with your plans, site elevation, opening dimensions, and performance requirements to discuss suitable Low-E glass, IGU, laminated glass, Max Windows, and curtain wall configurations.