Buildings exposed to heavy rain need windows and glazed façades with documented water-penetration performance and details that direct collected water back outside. Review the frame joints, flashing, and wall connections before fabrication.
In new construction, the window or façade supplier and the project team can develop these connections alongside the wall design. In a renovation, start by identifying what will remain and which concealed connections need inspection.

Identify the Rain Exposure at Each Opening
A window on an exposed upper wall and an entrance beneath a deep canopy may face different rain conditions. Look at the elevation, overhangs, surrounding surfaces, and runoff from above. The required water resistance should reflect the opening’s exposure.
For a project in western Washington, account for wet winter conditions when planning windows and glazed entrances. Mark the exposed openings on the drawings and include sections through any sheltering canopy. Set the water-penetration criteria for those openings before comparing systems.
Follow the Water From the Wall to the Exterior
Water may travel down the face of the building or within a wall’s drainage layer before it reaches an opening. The installation details need to show how it passes around the frame and returns outside without reaching moisture-sensitive materials.
Flashing and Frame-to-Wall Connections
Flashing directs water around the opening and connects with the wall’s water-management layers. Review that continuity at the top, or head, and along the sides, or jambs. Where sill flashing is used at the bottom, its corners and ends help contain collected water until it can drain outside.
For a storefront renovation in Oregon, existing flashing may be concealed by finishes around the original frame. Establish what needs to be exposed for inspection before finalizing the replacement scope. Show how the new flashing connects to the wall materials that will remain.
If a renovation starts with an existing leak, PRL’s guide to water leaking from a window frame explains how to investigate the source before choosing a repair or replacement.
Window Frames, Drainage Outlets, and Sash Seals
Some window systems collect water in channels within the frame and release it through exterior outlets. Keep those outlets clear during glazing, sealing, and finishing. Sealant applied across a drainage opening can prevent the frame from emptying as designed.
At an operable window, the joint between the moving sash and the frame also needs attention. The seals must fit correctly, and the hardware must allow the sash to close and latch as designed.
A residential project in Florida might combine fixed windows with operable units for ventilation. PRL MAX Windows offers fixed, awning, and casement options. Identify the proposed type, size, and glazing when requesting performance information. For operable units, assess rain resistance in the documented closed configuration.
Storefront Sills and Entrance Thresholds
At a street-level entrance in Louisiana, review the threshold, adjoining pavement, and exterior drainage together. The section drawing should show where surface runoff goes and how water is kept from collecting against the doorway.
Within the storefront, trace the sill flashing to the point where it meets the door frame. The fixed glazing and entrance can have different seals and drainage provisions, so their connection needs a detail of its own.
PRL’s storefront systems can be supplied with compatible aluminum entrance doors. Select the door’s seals, threshold, and hardware for the intended application, and ask which entrance configuration the water-penetration documentation covers.
Detail Curtain Wall Joints and Perimeter Connections
Across a larger glazed façade, water management depends on the joints between framing members as well as the building perimeter. Show the required seals at horizontal-to-vertical connections and how drainage continues through the selected system.
For PRL curtain wall systems, use the installation details for the selected series to review these joints. At the perimeter, identify how the curtain wall connects to adjacent walls, flashing, and other construction.
Sealant compatibility and adhesion also need attention. Provide the sealant supplier with information about the materials it will contact so the project team can establish surface preparation and joint requirements before work begins.
Match Water-Penetration Test Results to the Proposed Opening
A statement that a product was water tested needs supporting information. Ask for the test method, pressure, specimen dimensions, configuration, and reported result. Compare that information with the opening being specified.
ASTM E331 evaluates water penetration under a uniform static pressure difference; ASTM E547 uses a cyclic static pressure difference. A report for one configuration does not automatically establish performance for other sizes, glass options, or door arrangements. Structural and impact results address separate requirements.
Where field testing is specified, define its scope and acceptance criteria early. ASTM E1105 provides a method for evaluating installed assemblies. Identify whether the evaluation will also cover the joints between the frame and adjacent construction.
Review Windows and Façade Options With PRL
Send PRL the project location, elevations, opening sizes, and proposed window or door types. Include available head, jamb, sill, and threshold details, along with the water-penetration requirements. For a renovation, mark the components you intend to retain.
Contact PRL Glass & Aluminum to review MAX Windows, storefront, curtain wall, and aluminum entrance options for your project.